Safety And Environmentally Courts Sports Surface Flooring Athletic Running Track
Product Description
1. Preparation (1) Plastic track material access (2) Preparation of construction tools and equipment (3) Hydropower is in place
2. Basic treatment (1) Plastic track grinding and repairing the ground that does not meet the requirements (2) Cleaning the site
3. First set the four straight lines of the line, then place the line in the straight part of the field. Lines should be bright colors and lines should be used as a reference. The inner wire should be released and then the inside and outside should be followed. Release various construction lines.
4. The runway is polished, the plastic runway (bottom-up) is naturally laid on the ground, and the underside is polished with a sander.
5. Apply the primer with a professional adhesive. Spread from the starting area along the running direction.
6, plastic track bonding (1) paving rubber sheet (2) paving adhesive (3) bonding (4) surface pressing (5) port cutting
7. After cleaning the plastic track area and the adhesive is completely cured, clean the site, check the interface of the runway, repair the area where the interface is not strong or uneven, and prepare for the next process.
8. Line plastic track line is a carefully crafted program. In addition to ensuring the accuracy of measuring instruments, equipment and tools, construction workers should also have a strong sense of responsibility and serious work.
9. Clean up the site After completing all the above steps, clean up the site and keep the site clean.
CONTACT US
Zibo Century Union New Building Materials Co.,Ltd
Address: North of Nanling South Road,High-tech Zone, East of Zibodong Railway,Zibo,Shandong
Contact Person: Jiguang Chen
Phone:+86-533-3781329
Fax:+86-533-3781125
© 2019 CHINA WAY. All Rights Reserved.Zibo Century Union New Building Materials Co.,Ltd,Inc. All Rights Reserved. Sitemap. Sitemap.html